What is the ideal order for finishing multiple rooms?

I recently finished installing and taping drywall in my attic bedroom and bathroom and hallway (boy did that take forever!) With the drywall done I'm not sure what the ideal order for the next steps are to prevent unnecessary re-work, mess cleanup, etc. I realize for some the order doesn't matter, but are there any in my list below that are unideal order? Am I missing any obvious steps? 1. Install concrete board in bathroom walls and floor. 2. Install Bathroom Tile 3. Electrical : Install remaining outlets and switches 4. Install window seats. (I have framing already done) 5. Install interior doors and closet doors. 6. Install baseboard trim and door molding. 7. Paint Primer on drywall and trim